What a CCEW is and when you need to lodge one

Updated 15 November 2026

A CCEW (Certificate of Compliance for Electrical Work) is the NSW electrician's declaration that wiring work they installed, repaired, added or altered complies with AS/NZS 3000 and has been tested. It's needed on most jobs, including like-for-like swaps, and the NSW Government's guidance sets a lodgement window of 7 days after the work and testing are finished. Here's when it applies, what goes on it and how to keep it from slipping.

The CCEW is one more piece of paperwork that belongs with the job, alongside the report you write when you mark the job complete.


What the CCEW actually is

A Certificate of Compliance for Electrical Work is a declaration by the licensed electrician who carried out the work that it complies with the relevant standards — primarily AS/NZS 3000, the Wiring Rules (see the NCC guide for trades) — and that the safety and compliance testing has been done.

It is not an inspection certificate. It's your professional declaration that the installation you've completed meets the standard, and lodging it puts on record that the work was done and tested by a licensed electrician.


When is a CCEW required?

The NSW Government's rule is that a CCEW is needed for work that involves installing, repairing, adding or altering electrical equipment in an electrical installation. That covers more than most people assume:

  • New electrical installations
  • Additions to existing installations (new circuits, additional power points, new sub-boards)
  • Alterations and relocations of fixed wiring
  • Replacement of switchboards or distribution boards
  • Fault repairs
  • Like-for-like replacements. Swapping a water heater, oven, cooktop or an electrical accessory for a matching one still needs a CCEW. This is the one most often skipped.

If you're unsure, check the guidance or lodge. A CCEW lodged when one wasn't technically required costs you five minutes. A missed one can cost you a penalty and a conversation with the regulator.


Residential vs commercial jobs

The obligation applies to both.

For residential work, a CCEW comes up on bread-and-butter jobs: a switchboard upgrade, a new circuit for an air conditioner, an EV charger, a replaced oven.

For commercial work, the same obligation applies. On large projects with multiple trades and a head contractor, make sure your CCEW is on your own close-out list. Don't assume someone else is handling it.

The address on the CCEW must be the address where the work was performed. For commercial work with multiple tenancies or floors, be specific.


The 7-day window

You must lodge the CCEW no later than 7 days after completing the work, including the safety and compliance test. Lodgement is through the NSW Government's eCert portal, or by giving the information to an eligible entity within the same 7 days.

Seven days sounds generous, but it slips easily when the paperwork waits for a quiet day. Lodge on the day you finish, or as part of your end-of-day admin, and it never becomes a problem.


What a CCEW must contain

Expect the form to ask for:

  • The address of the work
  • A description of the work performed
  • The date the work was completed
  • Your licence details
  • The test results and a declaration of compliance with AS/NZS 3000

Errors or omissions mean the form has to be corrected and resubmitted, which eats into your 7 days. Get the details right the first time.


The penalty for not lodging

Under the regulation, the maximum penalty for failing to lodge is 20 penalty units for an individual and 40 penalty units otherwise. Repeat problems can also lead to action against your licence.

If something goes wrong at a property and there's no CCEW on record for the work, your exposure is worse. This is a live obligation on every eligible job.


Keeping records

Even after you lodge, keep a copy of every CCEW you submit (a job card is a handy place to note it), and see sending an invoice for closing the job out. If a customer queries the work two years later, you want to be able to produce it quickly.

The CCEW is separate from your test-and-tag records (covered in our test and tag guide). They're different documents with different obligations, and one doesn't substitute for the other.


FAQ

Do I need a CCEW for a like-for-like replacement?

Yes, according to the NSW Government's guidance. Swapping an oven, cooktop, water heater or accessory for a matching one still needs a CCEW.

How long do I have to lodge a CCEW in NSW?

No later than 7 days after you finish the work, including the safety and compliance testing. Check the current NSW Government page before relying on it.

Where do I lodge a CCEW?

Through the NSW Government's eCert portal, or by giving the information to an eligible entity within the same window.

Is a CCEW the same as a test and tag record?

No. A CCEW covers fixed wiring work under AS/NZS 3000. Test and tag covers portable equipment under AS/NZS 3760 and isn't lodged with government.

How Avro handles CCEW records

In Avro the job keeps its photos, notes and service report together, and you send the invoice from the same job, so the CCEW details you record sit against the address, client and date. That beats an email folder you'll spend twenty minutes searching through in a dispute.


The short version

  • A CCEW is required for installing, repairing, adding or altering electrical equipment in NSW — like-for-like replacements included
  • Lodge no later than 7 days after completing the work and the testing
  • Lodge through the eCert portal or an eligible entity
  • The maximum penalty is 20 penalty units for an individual, 40 otherwise
  • Keep copies of every CCEW you lodge

Build the lodgement into your job close-out (see electrician software) and it becomes routine. Leave it for later and it becomes a problem.


Sources: NSW Government, "When to submit a Certificate of Compliance for Electrical Work (CCEW)" (nsw.gov.au), including its summary of the penalty in s 37A of the regulation. This is general information, not legal advice. Check the current NSW guidance before relying on it.