Test and tag in Australia — what AS/NZS 3760 actually requires
Updated 15 November 2026
AS/NZS 3760 is the Standard for in-service inspection and testing of portable electrical equipment in workplaces. It sets which equipment is covered, how often it's tested (from 3 months on construction sites to several years in low-risk offices), what goes on the tag and what records you keep. This guide covers each of those, and why test and tag isn't the same as a CCEW. The records matter as much as the testing, so it's worth reading alongside our guide to writing up the job when you mark it complete.
What AS/NZS 3760:2022 covers
AS/NZS 3760 is the Australian and New Zealand Standard for in-service safety inspection and testing of electrical equipment. It applies to portable electrical equipment used in workplaces — tools, extension leads, appliances, portable power boards.
The standard covers:
- What equipment needs to be tested
- How often it needs to be tested
- What tests are required (visual inspection, earth continuity, insulation resistance)
- What must appear on the tag
- What records must be kept
It does not apply to fixed electrical installations (that's AS/NZS 3000 territory). The distinction matters: a fixed air conditioner is not subject to AS/NZS 3760. A portable heater plugged into a power point is.
What equipment requires testing
The standard applies to any electrical equipment that is:
- Supplied at voltages up to 1,000V AC
- Used in a workplace
- Portable, handheld, or moved during normal use
In practice, this captures power tools, extension leads, portable lighting, portable power boards, IT equipment in office environments (though IT equipment has modified testing intervals), kitchen appliances in commercial kitchens, and similar.
Equipment that is fixed to a structure and permanently connected (hardwired) is generally outside the scope of AS/NZS 3760.
How often does equipment need to be tested?
The standard sets testing intervals based on the environment and the type of equipment:
- Construction and demolition sites: 3 months (tools in hostile environments)
- Factories, workshops, and similar: 6 months to 1 year depending on equipment type
- Office and low-risk environments: 2–5 years depending on equipment type
These intervals are a guide, not a ceiling. Workplaces can choose shorter intervals if their risk assessment calls for it. If a risk assessment supports a different interval, write down why.
Equipment that has been repaired or modified must be tested before being returned to service, regardless of when it was last tagged.
The testing interval appears on the tag so the workplace knows when the next test is due.
What the tag must say
This is where a lot of DIY test-and-tag falls short. Under AS/NZS 3760, the tag must include:
- Date of testing
- The date the next test is due
- Whether the equipment passed or failed
- The identifier of the person who performed the test
"Identifier" means your name or a code that links the tag to your records. A tag with just a date and a green sticker doesn't meet the standard.
Failed equipment must be tagged out of service immediately and removed from use. A failed tag is not a recommendation — it's a requirement to take the item out of service until it's repaired or disposed of.
Record-keeping obligations
AS/NZS 3760 requires that testing records be kept. The record for each item should include:
- Equipment description and identifier (asset tag or serial number)
- Location
- Date tested
- Test results (visual inspection pass/fail, earth continuity reading, insulation resistance reading)
- Next test due date
- Tester identification
These records need to be available to the workplace's WHS officer or to a regulator if requested. Keeping them in a folder of paper test sheets works — barely. Most operators move to electronic records because searching, sorting by due date, and generating client reports is much faster.
CCEW vs test-and-tag — not the same thing
A question that comes up regularly (see our CCEW guide): does a CCEW cover test-and-tag obligations, or vice versa?
No. They're completely separate.
A CCEW (Certificate of Compliance for Electrical Work) applies to electrical wiring work on fixed installations. It's lodged through the NSW eCert portal within 7 days of finishing the work and declares that the wiring work meets AS/NZS 3000.
Test and tag under AS/NZS 3760 applies to portable electrical equipment in the workplace. The records are kept by the person who performed the testing — they're not lodged with any government body.
Doing a test-and-tag round on a commercial site does not generate a CCEW obligation. Installing a new circuit on that same site does.
FAQ
How often does equipment need to be tested and tagged?
It depends on the environment. Construction and demolition sites are the shortest interval, commonly 3 months; offices and low-risk areas are the longest. Check the current AS/NZS 3760 and your state WHS regulator.
Is test and tag compulsory?
In some workplaces your state WHS rules require it, such as construction. Elsewhere it's a common way to meet the duty to manage electrical risks. Check your state regulator.
What has to be on a test and tag label?
At least the tester's name or identifier, the test date, the next test date and the result. Check the current Standard for the full list.
Does test and tag apply to fixed wiring?
No. Hardwired equipment and fixed installations sit under AS/NZS 3000, not AS/NZS 3760.
How Avro handles test-and-tag jobs
Test and tag rounds are recurring work — the same sites, the same equipment, on a fixed schedule. Avro's scheduling lets you set up recurring jobs so each round is already on the calendar at the interval the site needs, and the round's report and invoice go out from the same job. See electrician software.
The practical checklist
Before you offer test and tag as a service, make sure you can deliver all of this:
- A calibrated tester that meets the instrument requirements in AS/NZS 3760
- Visual inspection followed by instrument testing (both are required)
- Tags that include all required fields, not just a date sticker
- Electronic or paper records per item that include test readings
- A report you can hand to the client showing what was tested, results, and next due dates
Customers — especially commercial operators — increasingly ask for the electronic record, not just the physical tag. Build that into your service from the start.
Sources: AS/NZS 3760:2022 (Standards Australia catalogue); WorkSafe Queensland, Testing and tagging electrical equipment. This is general information, not legal or technical advice. Check the current Standard.