NCC 2025: what changed and when it applies in your state
NCC 2025 is the newest edition of the National Construction Code. The Australian Building Codes Board (ABCB) published it on 1 May 2026, but each state and territory decides when it starts. For the next year, which edition applies depends on where the job is and when it was approved.
Here is where each state is up to, and what actually changed.
Last checked: 13 November 2026. Adoption dates and state variations can change. Confirm with your building surveyor or certifier for any job.
When NCC 2025 applies, state by state
| State or territory | NCC 2025 status |
|---|---|
| Victoria | Adopted from 1 May 2026. |
| ACT | Adopted 1 May 2026, with a 12-month transition. Mandatory from 1 May 2027. |
| Western Australia | Adopted 1 May 2026, with a 12-month transition. Mandatory for most applications from 1 May 2027. |
| New South Wales | Stays on NCC 2022 until 30 April 2027. NCC 2025 from 1 May 2027, with NSW variations. |
| Queensland | Stays on NCC 2022 until 30 April 2027. NCC 2025 from 1 May 2027, with Queensland variations. |
| South Australia | Plumbing Code (Volume Three) adopted 1 May 2026. Building code (Volumes One and Two) from 1 May 2027. |
| Tasmania | NCC 2022 reinstated from 5 June 2026. NCC 2025 scheduled for 1 May 2027. |
| Northern Territory | Not adopted. NCC 2022 continues, with no date set for NCC 2025. |
The edition that applies to a project is usually set by the date the building approval was applied for or granted, so two jobs on the same street can be under different editions.
What changed
NCC 2025 is mostly a commercial update. Building ministers agreed in 2025 to pause further residential changes, other than urgent safety and quality fixes, until mid-2029. For houses, the changes are smaller than in NCC 2022.
Condensation management
The biggest change for houses. Housing Provisions Part 10.8 (and Part F8 in Volume One) has been updated again, with new rules for how vapour moves through external walls and changes to roof space ventilation. The ABCB gives reduced ventilation for small roofs as one example. See our subfloor ventilation and condensation guide.
Water management
Waterproofing and external water management provisions are strengthened, mainly for Class 2 to 9 buildings. The wet area rules for houses in Housing Provisions Part 10.2 are largely unchanged. See our wet area waterproofing guide.
Referenced standards
Dozens of new or revised Australian Standards become a compliance option, including updated wind loads for housing (AS 4055), timber framing (AS 1684) and swimming pool barriers (AS 1926.1).
Commercial energy efficiency
Tighter energy efficiency rules for commercial buildings. The 7-star energy rules for houses from NCC 2022 are not changed.
Other changes
- All-gender sanitary facilities as a Deemed-to-Satisfy option.
- Carpark fire safety updates.
- New Performance Solution methods for structure and fire safety.
What did not make it in
Proposed EV charging readiness rules for houses were dropped, and proposed changes to the residential energy efficiency parts (Volume Two Part H6 and Housing Provisions Section 13) are not going ahead.
What this means for your work
- Check the edition on the approval before you quote or build. A job approved under NCC 2022 stays under NCC 2022.
- Work across borders? A business working in Victoria and NSW will run both editions until May 2027.
- Building inspectors: pre-purchase inspections under AS 4349.1 are not code audits, but if you refer to the NCC in a report, name the edition.
- Read the state variations. NSW and Queensland have both said they will vary NCC 2025.
Sources
- ABCB, NCC 2025 and adoption information: ncc.abcb.gov.au and abcb.gov.au
- NSW Government, "NSW to adopt new National Construction Code in May 2027"
- QBCC, "Navigating the NCC"
- PlanSA, NCC 2025 updates
This guide is general information, not legal or compliance advice.