How to quote a job

To quote a job, see the site, work out materials and labour, add travel, overheads and your margin, show the price with GST, and write down exactly what's included and what isn't. Give the quote a valid-until date, send it the same day if you can, and follow it up. This guide walks through each step for Australian tradies and service businesses.

Sources: NSW Government, Contracts for residential building work; NT Government, Quotes and estimates. Checked 13 November 2026.

Step by step

  1. 1

    See the job

    Go to site or get photos and measurements. Most quotes that go wrong were priced from a phone call. Note access, parking, height, anything under the house or in the roof, and anything that needs fixing first.
  2. 2

    Cost the materials

    List every material and part with the quantity and your cost price, then add your markup. Include consumables and waste.
  3. 3

    Work out the labour

    Hours on site for each person, times your hourly rate. Your rate has to cover more than wages: insurance, the vehicle, tools, phone, office time and the hours you can't bill.
  4. 4

    Add travel and any call-out

    Charge travel time or a call-out fee consistently. Many businesses set a base area and add a fixed amount beyond it.
  5. 5

    Allow for the unknowns

    If you can't see what's behind the wall, either add a contingency or exclude it in writing and price it as a variation if it turns up.
  6. 6

    Show GST

    If you're registered for GST, show the total including GST and the GST amount. That's the number the client compares.
  7. 7

    Write the scope and the exclusions

    Say what you'll do, what materials and brands you'll use, and what's not included. Clear exclusions prevent most arguments at invoice time.
  8. 8

    Set terms and a valid-until date

    Deposit, when payment is due, and how long the price holds. 30 days suits most service work.
  9. 9

    Send it fast and follow up

    A quote sent the same day often beats a cheaper one sent next week. Follow up once, a few days later.

Quote or estimate?

A quote is a fixed price for the work described. When the client accepts it, it becomes the agreed price, and neither side can change it without the other agreeing. An estimate is your best guess; the final price can move, but it shouldn't end up much more than you estimated.

Label the document clearly, and if the price could change, say what would change it. See NT Government and WA Consumer Protection on quotes and estimates.

When you need a written contract (NSW)

In NSW, residential building work needs a written contract if the price is over $5,000 including GST, or the price isn't known but the labour and materials would reasonably cost more than that. Work between $5,000 and $20,000 needs a "small jobs" contract; work over $20,000 needs a fuller home building contract. A quote on its own isn't enough at those amounts.

Other states set their own thresholds. Check with your state's fair trading or building regulator. Source: NSW Government.

What every quote should show

  • Your business name, ABN, licence number if your trade needs one, and contact details.
  • The client's name and the site address.
  • A quote number and date.
  • The scope of work, line by line, and what's excluded.
  • The price, the GST and the total.
  • Payment terms, any deposit, and the valid-until date.
  • How the client accepts: a signature, or an accept button.

Quoting in Avro AI

In Avro AI you build the quote from your own items and prices, entered including or excluding GST. The client gets a link where they can open the quote, sign it and accept it online. You turn an accepted quote into a job in one step, and invoice the job when it's done. You can see which quotes you won and lost.

See quotes and invoices and the free tax invoice template.

Questions

What's the difference between a quote and an estimate?

A quote is a fixed price for the work described. Once the client accepts it, neither side can change it without the other's agreement. An estimate is your best guess at the cost, so the final price can differ, but it shouldn't be much more than you estimated.

Should my quote include GST?

If you're registered for GST, show the price including GST, and show the GST amount too. Homeowners compare total prices, and a business client needs the GST shown when you invoice.

How long should a quote be valid for?

Set a date on every quote. 30 days is common for most service work; shorter if your material prices move a lot. After that date you can re-quote at current prices.

Do I need a written contract as well as a quote?

In NSW, residential building work over $5,000 (including GST) needs a written contract, and work over $20,000 needs a fuller one. Other states have their own rules and thresholds, so check with your state's fair trading or building regulator.

How do I follow up a quote without being pushy?

One short message a few days after you send it, asking if they have any questions. If they've gone with someone else, ask what decided it. That's how you learn whether your price or your scope was the problem.

Send the quote before you leave the driveway

There's a free plan to start.

Start free

This is general information, not legal or tax advice. Rules differ by state; check your state's regulator or an adviser for your situation.

How to quote a job: a step-by-step guide for tradies and service businesses — Avro AI