AS 3660.1 certificate of installation: what goes on it
A certificate of installation for termite management in new building work records which system was installed under AS 3660.1, where and when, by whom, with what product, and what the owner needs to do to keep it working. It goes to the builder and owner, and the certifier usually needs it before signing off the building. A durable notice with the key details is also fixed to the building, usually in the meter box.
This page sets out what the certificate and notice should show, in plain English, with a checklist. It's a summary, not the Standard. AS 3660.1 is copyright and sold by Standards Australia, so check the current Standard for the exact requirements.
Last checked November 2026. Edition: AS 3660.1-2014, Termite management, Part 1: New building work (with Amendment 1, 2017).
When is a certificate of installation needed?
Under the National Construction Code, a house or Class 10 building in an area where subterranean termites are a known risk needs a termite management system if its main structural parts can be damaged by termites. The system has to comply with AS 3660.1, or pass the tests in AS 3660.3, and carry a durable notice.
The certificate is how the installer shows the work was done to AS 3660.1. Building regulators expect the surveyor or certifier to check the installed system before final sign-off, and the certificate is usually what they ask for. Victoria's building regulator notes that AS 3660.1 itself has an appendix listing what the certificate must carry.
What details go on the certificate?
The job
- Property address, plus lot and plan numbers where you have them.
- The builder, and the owner.
- The construction or development approval number, if the certifier wants it.
- A short description of the building and its footings: slab on ground, suspended floor, or a mix.
The installer
- Your business name and contact details.
- The installer's name and licence number.
- The date of installation, and the date the certificate was issued. Don't date the certificate earlier than the work.
The system
- The type of system, or each system where more than one is used: physical, chemical, or a combination.
- Where each part was installed: perimeter, slab penetrations, slab joints, piers and the like.
- For a physical system: the product and its certification (AS 3660.3 testing or a CodeMark certificate), and how it was joined to the slab and other systems.
- For a chemical system: the product, active ingredient, APVMA registration number, the strength used, the volume and the length or area treated.
- For a reticulation system: the brand, where the fill points are, and the refill details the manufacturer requires.
- How long the system is expected to protect the building, under the conditions it was installed for.
The paperwork around it
- A diagram showing where the system runs and where any fill points or access points are.
- Whether the durable notice has been fixed, and where. If not yet, why and when it will be.
- Any limits on the installation, such as parts that rely on the builder's work or areas that couldn't be treated.
- Whether this certificate covers the whole system or one stage of it.
- The recommended inspection interval.
- A statement that the system was installed to AS 3660.1 and the manufacturer's instructions, with the installer's signature.
What goes on the durable notice?
The NCC Housing Provisions require a durable notice, fixed permanently in a prominent place such as the meter box. It must show:
- the termite management system used;
- the date it was installed;
- for a chemical system, the life expectancy shown on the product's registered label;
- the installer's or manufacturer's recommendations for how often, and how far, future inspections should go.
Some states and installers fix a second notice inside the house, such as in a kitchen cupboard. Take a photo of the notice once it's fixed and keep it with the certificate.
What about stage certificates?
On many new builds, the system goes in over more than one visit: penetrations before the slab pour, the perimeter later. Some builders want a certificate for each stage. If you issue one, say clearly which part of the system it covers and that the system isn't complete yet. The final certificate covers the whole system.
What should the owner be told?
The system only works if the building stays inspectable. The certificate or a handover note should tell the owner:
- to have the system inspected at the recommended interval, usually at least every 12 months, and more often where the risk is higher;
- not to cover slab edges, weep holes or inspection zones with garden beds, paving, render or soil;
- not to disturb treated soil, and to tell their pest technician before landscaping or renovating near the house;
- for reticulation, when it needs refilling.
Checklist
- Property address, lot and plan
- Builder and owner
- Approval number if needed
- Building and footing description
- Business name and contact details
- Installer name and licence number
- Installation date
- Certificate date, not before installation
- System type for each system
- Where each part was installed
- Physical system: product and its certification
- Chemical system: product, active, APVMA number, strength, volume, length or area
- Reticulation: brand, fill points, refill details
- Expected period of protection
- Diagram
- Durable notice fixed: where, with a photo
- Limits on the installation
- Whole system or which stage
- Recommended inspection interval
- Owner's maintenance notes
- Statement of installation to AS 3660.1 and the manufacturer's instructions
- Signature
For how AS 3660.1 relates to the other termite standards, see the termite standards in plain English. For the NCC side, see termite management for new homes.
Doing certificates on the job
Avro AI is built by a pest tech. It has an AS 3660.1 certificate set out for new building work: builder, lot and site details, each system with its product and APVMA number, fill points for reticulation, a diagram, the durable notice with a photo, stage certificates, and the inspection interval. A Certificates owing list shows jobs still waiting on one. If something needs correcting after it's finalised, a new version is made and the old one kept. The certificate goes to the builder as a PDF.
Start free, no card needed.
This page is general information, not legal or technical advice. It summarises AS 3660.1 and the NCC in our own words and doesn't reproduce the Standard. Check the current Standard, the NCC edition and state variations that apply, and the product manufacturer's instructions.
FAQ
Who issues an AS 3660.1 certificate of installation?
The licensed installer of the termite management system, at the end of the installation. It goes to the builder and owner, and the certifier usually wants a copy.
Is the durable notice the same as the certificate?
No. The durable notice is a short permanent label fixed to the building, usually in the meter box. The certificate is the full record of the installation.
Do I need a new certificate if I fix a mistake on it?
Issue a corrected version and keep the original on file, so there's a clear record of what changed and when.
Does AS 3660.1 cover existing houses?
No. AS 3660.1 is for new building work. Termite management in and around existing buildings falls under AS 3660.2.
Sources
- https://ncc.abcb.gov.au/editions/ncc-2022/adopted/housing-provisions/3-site-preparation/part-34-termite-risk-management (ABCB Housing Provisions Part 3.4: when a system is needed, AS 3660.1 or AS 3660.3, APVMA-registered chemicals, durable notice and its four items). Checked 15 Nov 2026.
- https://www.vba.vic.gov.au/news/news/2022/requirements-of-chemical-termite-management-systems (VBA: AS 3660.1 appendix lists certificate contents; surveyor verifies installed system before occupancy; chemicals APVMA-registered and applied to label). Checked 15 Nov 2026.
- https://www.qbcc.qld.gov.au/sites/default/files/documents/publication-termite-management-systems-homeowners-builders.pdf (QBCC: certificate details including date, owner, builder, property and real property description, building description, work with a diagram; durable notice contents; owner information; inspections at least every 12 months). Checked 15 Nov 2026.
- https://descomconsultant.squarespace.com/as-3660-1-guide-termite-management-for-new-homes (consultant summary: certificate shows method, areas treated, installer name and licence, installation date; installer certifies compliance). Checked 15 Nov 2026.
- https://www.midwestern.nsw.gov.au/files/assets/public/v/1/development/forms/termite_risk_management_certificate[1].pdf (NSW council termite certificate form: CC/CDC number, property, system type, installer licence, signature, date). Checked 15 Nov 2026.
- https://professionalpestmanager.com/professional-pest-manager-magazine/new-construction-termite-work-part-2/ (trade magazine: durable notice content; Queensland dropped its two-notice requirement, author favours two; product certification by AS 3660.3 testing or CodeMark; do-not-disturb advice to occupiers). Checked 15 Nov 2026.
- https://wa.gov.au/system/files/2024-10/ib_83_termite_management_standards_0.pdf (WA Building Commission bulletin: 2014 edition required from 1 May 2017). Checked 15 Nov 2026.
- Avro's own template: lib/reports/templates.ts, AS 3660.1-2014 certificate v2 (fields used in "Doing certificates on the job"). Checked 15 Nov 2026.